01 / Project details

Check the project name, number, structure type, organization, author, reviewer and date. Remove example details. Keep the cover on one page and export long names to check wrapping or clipping.

02 / Content and layout

Review contents, heading levels, formulas, units, diagram labels and page numbers. Check symbols, values and wrapping in each language; inspect a printed copy when required.

03 / Match results to the model

Match the report to the current model, inputs and results. This actual summary follows smart sizing of the prefabricated pipe example; 29.10% applies only to these inputs and connector configuration.

STRUCTURE CUBE / V3.0.4REFERENCE CAPTURE
03 / Match results to the model · Pipe example · C41D beam · Maximum utilization 29.10%
Pipe example · C41D beam · Maximum utilization 29.10%

V3.0.4 / Read the check state first

After reopening, verify retained bases, connectors, hole layouts, deleted supports and releases. Across computers, check adopted project data rather than substituting a same-name local catalog entry.

A solved result can be exported while disclosing incomplete required checks. Incomplete or pending is neither a pass nor proof of insufficient resistance. Verify real parameters and details, then recalculate and export.

04 / Review and sign-off

The responsible engineering party reviews the report against project conditions and adopted standards, retaining sign-off and revision records. Public excerpts do not replace review of the complete report.